Location: Maadi Cairo - Egypt
Cost:
5 Million Egyptian Pounds
Year:
2012
Owner: AUDI Bank
Concord Scope of Work:
Concord carries out the architectural, electrical, mechanical
design and the structural design according to the design &
specification of Bank Audi
• Preliminary Design
•
Design Development & Drawings
• Supervision