Location: 3475 Ash Sheraa District Jeddah, Saudi
Arabia
Capacity: 500 beds
Area: 50,000 Sqm
Cost: 250 Million SAR
Year: 2012
Owner:Saudi
Ministry of Health
Concord Scope of work:
• Preparing allthe detailed andoperationalplansfor
the projectand workshop drawings
• Architectural
-construction–Electromechanical
• Review
designsquantities andspecificationsand preparation
oftechnicalreports
• Structural designreviewto ensure the
safetyof origin.
• Review electromechanicaldesigns
•
Provide technical support andengineeringconsultancyfor
implementationof the contractor